Material Selection and Pricing for Lombok Construction Projects

Material Selection and Pricing

Procurement decisions directly affect structural performance, durability, and compliance outcomes in Lombok. Below is a practical breakdown of commonly used materials and components—fasteners, steel profiles, roofing, drainage, electrical fittings, coatings, and pavingorganized for clarity. Prices provided reflect the list you shared and are shown with their stated units. In practice, prices on Lombok vary with availability, shipping from Java/Bali, and order volume. Verification at time of purchase is essential.



1) Structural Fasteners and Connectors

Fasteners determine how load paths are transferred through trusses, frames, and roofing systems. For coastal and high-humidity environments, ensure correct diameter, grade, and corrosion protection.

Steel Truss Bolts (Baut Kuda-kuda Baja)

Used in roof truss assemblies; diameter and length must match design.

Item

Spec

Unit

Price

Baut Kuda-kuda Baja Ø 17 mm (25 cm)

Ø17 × 25 cm

Buah

23,467

Baut Kuda-kuda Baja Ø 17 mm (30 cm)

Ø17 × 30 cm

Buah

52,146

Notes:

  • Match bolt diameter with hole sizing and plate thickness to avoid slippage.
  • Use washers and locking nuts to maintain pretension under thermal cycling.

SDS Screws (Baut SDS) – for sheet/steel fixing

Item

Spec

Unit

Price

Baut SDS 8

Ø8

23,000

Baut SDS 12

Ø12

20,000

In practice:  Self-drilling screws need appropriate coating (galvanized or alloy) to resist corrosion, especially beneath roofing sheets.

2) Lightweight Steel Profiles (Galvalume)

Galvalume C-channel sections are widely used for purlins and light framing. Thickness and geometry affect deflection and corrosion life.

Item

Spec

Unit

Price

Canal C 75–75 Galvalume

thickness 0.45 mm (noted “0,050 Uk 0,45 0,915”)

Batang

104,292

Canal C 75–60 Galvalume

Batang

52,146

Canal C 75–80 Galvalume

Batang

167,352

Notes:

  • Verify actual thickness (TCT/BMT) and coating weight; documentation must align with design loads.
  • Store off the ground and under cover to avoid edge rust and coating damage.

3) Pipes and Precast (Buis Sigaran)

Buis (precast concrete rings/pipes) are typically used for drainage, wells, or culverts. Ensure specification matches hydraulic and load requirements.

Item

Spec

Unit

Price

Buis Sigaran Ø 30, p = 1 m

Ø30 cm × 1 m

Buah

173,386

Buis Sigaran Ø 15, p = 1 m

Ø15 cm × 1 m

Buah

166,868

Buis Sigaran Ø 20, p = 1 m

Ø20 cm × 1 m

Buah

160,349

Buis Sigaran Ø 25, p = 0,50 cm*

Ø25 cm × 0.5 m

Buah

91,256

* Interpreted as 0.5 m length.

In practice:  Confirm compressive strength and wall thickness; avoid substitutions as they impact hydraulic capacity and backfill requirements.

4) Roofing and Ridge Accessories

Roofing selection must consider wind uplift, salt exposure, and rain intensity typical in Lombok.

Item

Spec

Unit

Price

Asbes Gelombang Besar

Large corrugated sheets

Lembar

45,629

Metal Polos Warna 0,22 (1 × 5 m)

Painted sheet, 0.22 mm

M

36,503

Bubungan – Ujung (Ridge end)

Ridge accessory

Buah

57,361

Bubungan – Tepi (Ridge edge)

Ridge accessory

Buah

14,992

Bubungan – Starter

Ridge starter

Buah

57,361

Bubungan – Segitiga

Ridge triangle

Buah

57,361

Bubungan – Atas

Ridge top

Buah

16,296

Notes:

  • For metal roofing, 0.22 mm is thin; confirm designer’s minimum thickness.
  • Ridge accessories must be compatible with sheet profiles to prevent leaks.

5) Roof Tiles (Genteng)

Ceramic and pressed tiles are common for villas; their weight influences truss design.

Item

Spec

Unit

Price

Genteng Keramik

Ceramic tile

Buah

24,379

Pejaten Lokal

Local tile

Buah

3,260

Pres Manual

Manually pressed

Buah

1,956

Pejaten

Buah

4,563

Mantili Besar

Large type

Buah

3,911

Silang Kodok Palembang

Patterned tile

Buah

3,260

In practice:  Tile selection drives truss spacing and batten sizing; ensure supplier consistency to avoid color mismatch and variable absorption.

6) Drainage

Well-designed drainage reduces maintenance and structural risk.

Item

Spec

Unit

Price

Talang PVC Kotak

Box-section gutter

80,433

Notes:

  • Confirm flow capacity and bracket spacing; UV resistance is important in tropical sun.

7) Electrical Fittings and Controls

Fit-out quality affects usability and maintenance cycles.

Item

Spec

Unit

Price

Fitting lampu no.210

Lamp holder

Buah

19,556

Fitting lampu no.216

Lamp holder

Buah

14,471

Fitting lampu no.220

Lamp holder

Buah

26,073

Fitting lampu no.226

Lamp holder

Buah

15,644

Lampu Otomatis (Sensor Cahaya)

Photo-sensor light

Buah

72,353

Fitting Putih Keramik

Ceramic fitting

Buah

37,806

Multimedia Controller / traffic light

Controller

Unit

847,372

Controler traffic light (set)

System set

Set

8,473,718

In practice:  Ensure proper IP ratings in outdoor zones and document brand/model to maintain consistency.

8) Coatings and Paints

Protective coatings extend steel life; application method matters.

Item

Spec

Unit

Price

Cat semprot Danagolf D10 0,1500

Spray paint/coating

Botol

30,348

Notes:

  • Confirm technical datasheet (coverage, VOC, curing). Surface prep is critical for adhesion in humid climates.

9) Framing, Doors, and Miscellaneous

Item

Spec

Unit

Price

Bingkai Lampu / Promosi

Frame (vinyl display)

Buah

9,454,715

Pabrikasi Pintu viber polos

Plain fib(e)r door fabrication

162,96 *

Cok Roll 10 M

10 m roll

Pcs

229

* The door line in the provided list is unclear; confirm specification and unit before use.

10) Paving Blocks (Outdoor Surfaces)

Strength class and compaction quality determine performance under load and rainfall.

Item

Spec

Unit

Price

Paving Blok Manual

Manual press

78,219

Paving Blok Tebal 6 cm K100

6 cm, class K100

93,863

Paving Blok Tebal 6 cm K200

6 cm, class K200

113,418

In practice:

  • Subbase and bedding sand must be controlled (gradation and compaction).
  • Edge restraints reduce migration and settlement.

Procurement Reality in Lombok

Availability and Substitution: Materials such as higher-thickness galvalume, certified bolts, and specific roof tiles may not be available at short notice. Unverified substitutions create structural risk and complicate compliance inspections.

Supplier Verification: Request product certificates (SNI or recognized equivalents), mill test reports for steel, and datasheets for coatings and electrical fittings. Avoid informal suppliers where documentation is not consistent.

Logistics and Storage: Shipping from Java/Bali affects lead times and cost. Plan bulk orders for core structural items and maintain controlled storage to prevent corrosion and theft.

Quality Control on Site: Conduct basic tests (e.g., fastener torque checks, coating thickness readings, visual inspection of roofing overlaps, water tests on gutters). Document installation to align with PBG/SLF requirements post-construction.

Compliance Considerations (Practical)

While permit systems (OSS for submissions, PBG for building approval, SLF for post-completion function certification) are administrative, inspectors evaluate outcomes that reflect material choices and workmanship. Using thin roofing, ungraded purlins, or uncertified fasteners can trigger remediation or delay certifications. Clear specifications, supplier credentials, and site records support smoother approvals.

Working Approach We Recommend

  1. Define Specifications Early
    • For truss bolts: diameter, grade, coating.
    • For galvalume: section (75–60 / 75–75 / 75–80), thickness (BMT/TCT), coating weight.
    • For paving: compressive class (K100/K200), thickness, subbase build-up.
  2. Lock Suppliers and Lead Times
    • Identify primary and backup suppliers in Lombok/Mataram and Java/Bali.
    • Place orders for structural items first to avoid substitutions.
  3. Document Everything
    • Keep certificates, invoices, delivery notes, and site photos.
    • Record installation checks (torque, alignment, overlap dimensions).
  4. Test Critical Components
    • Pull-out tests for SDS screws where applicable.
    • Visual and leak testing for roofing and gutters.
    • Field density tests for paving subbase, if loads are high.
  5. Budget with Contingency
    • Prices shown above are item-level references from your list.
    • Include 5–10% contingency for logistics and availability.
    • Revalidate prices before tender or purchase order issuance.

Notes on the Price List Provided

  • Some lines are incomplete or duplicated (e.g., multiple “Bubungan” entries, “—” items, or unclear units). Where possible, we mapped items to typical usage and kept the listed prices.
  • Items such as  Canal C  have prices listed per  Batang ; confirm length per batang to avoid quantity errors.
  • For specialty items (e.g.,  traffic light controller sets ), installation and programming are separate costs not reflected in material unit pricing.

Summary

Material choices and procurement discipline have direct impact on structural reliability and regulatory compliance in Lombok. The tables above organize key items—bolts, SDS screws, galvalume profiles, buis, roofing accessories, tiles, gutters, fittings, coatings, and paving—with the prices you supplied. Before purchasing, verify specifications, units, and documentation, and plan for lead times due to island logistics. Consistency in materials and records reduces risk and supports a smoother PBG/SLF process after construction.

Postingan Terkait

No comments:

Post a Comment

Post Disclaimer

Disclaimer:   The information provided on this website is for general informational purposes only. While CV King Dates NTB Group strives to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, or reliability of the content. Any reliance you place on such information is strictly at your own risk. Construction costs, timelines, and regulatory requirements (such as PBG/SLF) are subject to change based on specific project locations and current Indonesian laws. For professional engineering and legal advice, please consult directly with our technical team.
HUBUNGI AHLI KAMI SEKARANG

Building Dreams in Lombok Starts with a Conversation. Let's Discuss Your Vision.

Start Your Project

Seach Articles

Our Leadership Team


Our Core Services

Comprehensive Construction & Consulting Solutions in Lombok


Table of Contents